Saturday, November 28, 2009
Calix Equipment Installation
This was where the fun begins on a C7 shelf installation. Shelf is powered and is ready to start the provisioning. Set up the LAN connection, connect the fiber optic cables, set the paths, and build the T1's. I do miss the sound of the fan shelf and the blinking lights. was nice to see something you built come to life and provide service.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment